Pakistan all set to take off in wind energy claims Tariq Izaz

Friday, February 24th, 2012 5:28:21 by

Pakistan all set to take off in wind energy claims Tariq Izaz

Thursday, February 23, 2012: Tariq Izaz, Project Director of Fauji Fertilizer Company Energy Limited (FFCEL), claims that Pakistan is all set to take the lead in countries producing electricity through wind.

The retired Brigadier held that this sector has grabbed the attention of investors while the Government is also keen on producing cheaper electricity thus it has adopted a lenient policy towards it.  

Speaking on the sidelines of a briefing arranged for select media at the company site at Jhampir, District Thatta, Izaz said, “With eight projects of wind energy in progress, the country is all set to take off in this area. This
will not only reduce electricity shortages, but will also help ease the burden of oil imports that cost over $12 billion annually”

Izaz believes that Pakistan has a very bright future in wind energy sector because of the wind corridors in Sindh. To support his point, the Brigadier said, the average category of wind speed in most parts of the world is between
6.2 and 6.9 metres per second (m/s). On the other hand, there are a few places that come under the good category where wind speed is between 7 and 7.3 m/s. For Pakistan’s advantage the wind speed in the Sindh corridor is stronger than any of the two categories
mentioned above and it stands in the excellent category that is between 7.5 and 7.7 m/s.

According to a USAID surrvey, Pakistan has the potential of producing 150,000 megawatts of wind energy, of which only the Sindh corridor can produce 40,000 megawatts.

Fauji Fertilizer Company Energy Limited (FFCEL) will start producing electricity on commercial basis from November 2012, which will be the first addition of wind power to the national grid. FFCEL will initially produce 50 megawatts
and later expand the capacity to 250 megawatts.

FFCEL, a subsidiary of Fauji Fertilizer Company, will start trial energy production from June, which will be provided to the national grid free of charge by the time commercial production starts in November.

Tags: , ,

Short URL: https://www.newspakistan.pk/?p=13674

Posted by on Feb 24 2012. Filed under Business, Pakistan. You can follow any responses to this entry through the RSS 2.0. You can leave a response or trackback to this entry

You must be logged in to post a comment Login

Join WishFree.com

Photo Gallery

Unique Auction UAE
Log in